Click on a photo to enlarge.
This Greenville, SC home had an old roof in need of a full replacement. The customer chose Owen's Corning Supreme shingles in Williamsburg Gray for the job.
This homeowner just purchased this property. The roof was old and was suffering from blistering and granule loss. He obtained 2 quotes for the replacement and chose Roof Roof based on our reviews. We started the project within two weeks. We removed the existing roof, installed ice and water shield in the valleys, installed underlayment in the field of the roof. We then installed Owens Corning Duration Onyx Black shingles. A chimney stack was removed and decked over per customer request. We finished it off with a new heat and moisture ridge vent and cap shingles. The project took two days to complete.
When this homeowner called Roof Roof in February, he was in need of immediate intervention. A branch had fallen through his roof, puncturing his shingles. Our rep went out and assessed the damage and gathered the necessary information to write an estimate. The next day Roof Roof sent a contractor out to tarp over the damaged area.
Due to the advanced deterioration of the roof and extensive damage caused by the fallen branch, our rep thought that the homeowner had the basis for a claim. A meeting was set with the adjuster and a new roof replacement was approved by the insurance company.
We began this job by removing the existing layer of shingles and applying a synthetic underlayment.The roof was re-shingled with OC Duration in Onyx black. A drip edge was installed and the roof was capped off with ridge vent to promote ventilation.
The homeowner had an old roof that need to be replaced. He contacted Roof Roof for a free estimate. Our friendly representatives came out and gave him the quote. He chose Roof Roof and we started the project within 3 days. We began by removing the old roof. Once the old roof was removed, we found quite a few pieces of wood that were rotten and needed to be replaced. After all the bad wood was replaced, we installed 15lb felt paper, ice and water shield, and of course, the shingles. The homeowner decided on Owen Corning Oakridge Williamsburg Gray. We finished off the project by installing ridge vent, new pipeboots and UV covers, and two new passive vents. The project took one day to complete.
This customer had to have their roof replaced due to severe wind damage. Shingles were missing, and many of the important seals on their roof had come apart, leaving the potential for water to enter the cost. After working with their insurance company and with a professional inspection by Roof Roof, they got their insurance to cover the cost of the new Owen's Corning Duration shingles Driftwood.
our service area